FEATURED PROJECTS
While Wheeling Corrugating remains a major player in the residential and commercial roofing and siding business through domestic sales and exporting, we are leading the industry in galvanized decking for complex buildings and high rise vertical construction.
Our customer list includes the 108-story One World Trade Center being built at the former sight of the Twin Towers in New York City; the 975-foot Comcast Center, the tallest building in Philadelphia, and the Pat Tillman Overpass, a 1,900 foot-long, four-lane span near the Hoover Dam.
We are equally proud of our complex structures, including the Mall of America in Minneapolis, Heinz Field and PNC Park and the Consol Energy (Penguins) Center in Pittsburgh, the Cleveland Browns stadium, the Paul Brown stadium in Cincinnati and the Orange County Convention Center in Orlando, Fla., the second largest convention center in the United States.
Location: Arizona / Nevada
Construction Completion Date: October 2010
Our Part:
The bridge deck,containing 6000 cubic yards of concrete, is supported on steel box girders. Wheeling Bridge Deck was used to form the deck.
Facts:
At the time of it's completion, the Colorado River Bridge was the longest concrete arch span in North America. Construction on the nearly 2,000 foot long bridge began in late January 2005 and traffic began using the Hoover Dam Bypass on October 19, 2010. The bridge arch span is 1060 feet long. The bridge deck is 900 feet above the Colorado River. This signature bridge which spans the Black Canyon is located 1500 feet South of the Hoover Dam.
Location: Philadelphia, PA
Construction Completion Date: June 6, 2008
Our Part:
Steel Decking, Project Management, Accessories.
Facts:
Tallest building in Philadelphia, second tallest LEED certified building in the U.S., the entrance contains two works of installation art;
Location: Wisconsin
Construction Completion Date: 1997 through 2011
Our Part:
Centurydrain provided by Wheeling Corrugating and built by Modern Pole Builders, Ripon WI
Location: Kansas City, MO
Construction Completion Date: October 2007
Our Part:
Wheeling Corrugating supplied steel roof and floor decking, accessories, detailing and related project management.
Facts:
Sprint Center is a large, multi-use indoor arena in downtown Kansas City, Missouri. The first event at the arena was Elton John who performed the night of October 13, 2011. The arena seats over 19,000 people and has 72 suites. Sprint Center opened on time and on budget.

